Pramotronik 4d 24 Instruktsiia -

: The air intake pipe (max length 2m) must be directed away from the vehicle's direction of travel and pointed downward to prevent water ingress. If downward orientation is impossible, a 3mm drainage hole must be drilled at its lowest point.

: The control unit activates the glow plug to heat the combustion chamber. Once the porous structure is hot, fuel and air are introduced. Once the flame sensor detects stable combustion, the glow plug is deactivated. Operating Modes : pramotronik 4d 24 instruktsiia

: The unit should be secured on an even surface (unevenness < 1mm) using the provided gasket. Always replace the gasket if the heater is reinstalled. Operating Instructions : The air intake pipe (max length 2m)

Below is a comprehensive guide based on the official manual and technical specifications. Technical Specifications Once the porous structure is hot, fuel and

: The exhaust pipe must lead outside the vehicle. A 10mm longitudinal slit should be made at the connection point for a tighter seal with the heater’s nozzle.