Due to these failures and conflicts, the engineer is formally documenting that they have "no responsibilities for What has been built or for the required structural modifications needed to stabilize the building as it now" exists.
This document highlights a significant, high-stakes conflict within a professional engineering project. Here is a detailed breakdown of the context:
I can try to find more specific information if I know where the file is from. 072-030-021 - Laserfiche WebLink - Butte County
